Connecting electric vehicle chargers and renewable
generation to the grid often results in ‘reinforcement charges’ that can easily
de-rail a project on cost and timescale grounds. Things are about to change in
a big way – we explore this on this
podcast, plus explore some news on the price cap, Ofgem and EDF.
Brian Moorhead MEng MIET Assoc CIPD is Grid Consultancy Director at eSmart Networks, heading up our UK-wide Grid Consultancy Team.
Brian has spent his whole career in the power industry across a range of roles focused on industrial electrification to the grid, connecting renewables, battery storage and EV charging.
His previous roles include Programme Management of Major Connections (11kV to 275kV) focused on Large Energy Users, Renewable and large-scale Battery Storage Projects; management of the DNO-ICP interface, developing grid policy at a nationwide level and client-facing project design & management.