Brian Moorhead & David McDonald talk you through the major changes that are just around the corner for grid connections in the UK.

For anyone with export capacity connections in the queue (connection offer accepted): we strongly recommend starting to do your homework for the recent Distribution and Transmission Networks Operators joint call to action.

All projects are required to provide information on planning status and land rights for all export capacity grid connections (some DNOs have specified >1MW only, we recommend you clarify this if <1MW).

Responding on time with the right information could be the difference between having 15 years added to your connection date, or having it accelerated. Export capacity for all accepted offers in the current queue is at risk.

➡️ Listen Now:

Spotify: https://ow.ly/ookr50S3LuM

Apple Podcast: https://ow.ly/AFvy50S3LuP

YouTube: https://ow.ly/AtXZ50S3LuU

Web Player: https://ow.ly/RARB50S3LuV

Like and subscribe to stay tuned.

Follow us on our social media channels:

LinkedIn: https://www.linkedin.com/company/esmartnetworks

Instagram: https://www.instagram.com/esmartnetworks

Twitter: https://twitter.com/esmartnetworks1

Facebook: https://www.facebook.com/eSmartNetworks

Share

Meet your host

Brian Moorhead

Brian Moorhead MEng MIET Assoc CIPD is currently Grid Consultancy Director at eSmart Networks, heading up their UK-wide Grid Connection Management Team.

Brian has spent his whole career in the power industry across a range of roles focused on industrial electrification to the grid, connecting renewables, battery storage and EV charging.

His previous roles include Programme Management of Major Connections (11kV to 275kV) focused on Large Energy Users, Renewable and large-scale Battery Storage Projects; management of the DNO-ICP interface, developing grid policy at a nationwide level and client-facing project design & management.

Listen to all episodes for free on